Update

Nov. 21st, 2008 10:17 am
billeyler: (Richmond house)
[personal profile] billeyler
Not really worth putting new pictures up, since the bulk of what has gone on this week has been having the drywall taped, mudded, 2 slick coats (4 days). Over the course of those days, we had various fans blowing and heaters on to keep the humidity down. Amazingly, the dust is not nearly as bad as we thought it was going to be.

Today, the actual texture coat is going on; there are at least three different types of coats being done, depending on what room it is. There was one set of non-English speaking guys that put up the drywall in about 6 hours last Friday. Joe has been working diligently by himself for 4 days to do the taping/mudding. It's a crew of two different guys today doing the texturing. I had no idea that the jobs were all so specialized! I'm pleased with the work they did.

Our sticking point right now is getting quotes for the tile work in the two bathrooms. We've decided we're going to do the two floors in the bathrooms ourselves as well as the backsplash in the kitchen. But in spite of that and us having to buy the tile ourselves (at contractor prices, we hope), the first quote was still $2,400 for labor. WTF? We've got two other quotes in process for this.

Danny and I plan on priming and painting some of the critical rooms this weekend, just to get that out of the way. It's merciful that we most of the living room paintwork doesn't have to be redone, since we just did that last year. Joe the drywall taper patched several problem areas that weren't part of the original plan.

Theoretically (and all jobs are always theoretical), the oak flooring work will commence on Monday. We have to move the refrigerator and all the paraphernalia laying about the floors, but that shouldn't be too bad. I hope.

I think we also need to take out the stairwell carpet and two large pieces of stairwell trim this weekend, too. We're having new wood stairs installed (more $$$). Ouch.

Since we'll be gone five days over Thanksgiving, the kitchen cabinet install is scheduled for 12/8. The bathroom vanities arrive on 12/3. We have to get the granite work scheduled after that.

I noticed yesterday that the terrazzo tiles in the foyer need serious cleaning AND resealing. They've take quite a beating over the years.

I don't know how long the contracted bathroom tile work will take. It's not a lot of square footage, so I was thinking a tile guy could do both baths in no longer than 16 hours. I don't think any tile work is worth $150 an hour, which includes one largish shower pan install, but no tiles included. Maybe I'm off in my calculations.

Date: 2008-11-22 06:33 pm (UTC)
From: [identity profile] pdxchuck.livejournal.com
At least you are seeing progress! Several years ago we had our downstairs bathroom and utility room completely reconfigured to be more efficient with the space, and to add a tub room. Since we had a working bathroom upstairs using the space downstairs was not critical. So we opted for the less expensive contractor option of "we can send people over when ever we have a break in the schedule". It took A LONG time for the project to be completed, often with someone coming by for about 15 to 20 minutes, hearing all kinds of banging and sawing only leaving us to wonder what they did for the short time they were here!

Date: 2008-11-22 06:58 pm (UTC)
From: [identity profile] billeyler.livejournal.com
That must have taken a very long time! Did the project ever get finished?

We'll probably have a lot of small unfinished projects that will drag on for years. Who knows!

Date: 2008-11-23 04:38 pm (UTC)
From: [identity profile] pdxchuck.livejournal.com
Yes, the project did take a long time and it did get finished. But we wound up painting the rooms 3 times. We would get them painted with the four different colors. We would come home to find they did more work. Repaint. Would come home again and find more work done. Repaint.

Hang in there are it sounds like you two are seeing and making a lot of progress.

As for anticipating many small unfinished projects, isn't that the whole definition of home ownership? :)

May 2022

S M T W T F S
1234567
89101112 1314
15161718192021
22232425262728
293031    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 28th, 2026 07:26 pm
Powered by Dreamwidth Studios